Compliance to User Acceptance 2781
-
Hello,
In our organization, the normal process for data or small configuration changes allows user/requester acceptance AFTER the change is performed. Our rfc system is also designed to include this workflow beofre close-completion of the request.
However, many of the requesters do not bother to user approve in the rfc system, probably because the request has alredy been served and its a waste of time. Now the rfc system is filled with incomplete requests.Any ideas on how to deal with this?
Thanks very much.
-
Require user acceptance prior to migrating the changes to production. Once migrated, you lose all leverage in getting a sign-off.